MULTAN RING ROAD

Project Description

POST CONSTRUCTION TRAFFIC STUDY & MODELING FOR MULTAN RING ROAD

This project was a validation exercise to examine the pre-construction traffic studies that were carried out for Multan Ring Road and their results that predicts the future scenarios of traffic volumes and patterns for this Ring Road.

The Consultant has carried out traffic studies and modelling exercise for the aforementioned project to develop and Supply and Demand Model for Multan Ring Road, the activities include collection of traffic data, particularly midblock volume counts surveys, intersection volume counts surveys, willingness-to-pay surveys, road user interview survey, and origin and destination surveys at various locations. After collection of all the data a comprehensive transportation model was developed using the transportation modelling software to extract all the demand and existing travel patterns as a part of this Project. This demand was further utilized by think transportation traffic engineering team to determine post construction level of services and various other traffic engineering parameters.

 

Project Details